
Two of the eight renders place the proposed homes into real drone photography. The remaining views cover street exteriors and interiors.
View the Molyneux case studyCromwell, Central Otago
Render Works has produced two Cromwell development campaigns for RAM Projects. Rocks on Holloway combined eight renders, film and branded assets. Molyneux followed with eight renders and a film, including aerial photomontages built on real drone photographs of its site. These projects give Cromwell clients concrete examples of street, interior and wider-context views.
Discuss a projectThe same developer commissioned two different sites. The useful lesson is in the source material: the Molyneux aerials relied on site photography, while both campaigns needed street and interior views tied to their own drawings and finishes.

Two of the eight renders place the proposed homes into real drone photography. The remaining views cover street exteriors and interiors.
View the Molyneux case study
The campaign brought together two aerials, three closer exteriors, three interiors, a film and branded assets.
View the Rocks on Holloway case studyAerial context can explain where the homes sit, but the buyer also needs the entry, exterior materials and rooms. Plan the sequence before deciding how many images to buy.
| View | Question it answers | Source to check |
|---|---|---|
| Aerial context | How does the development sit among the real roads, neighbours and landscape? | Survey, site plan and dated drone photographs |
| Street approach | What will a buyer see at the entrance and front door? | Elevations, access plan and materials schedule |
| Interior sequence | Which rooms and selected finishes need to be understood before sale? | Plans, finishes and furniture brief |
Use a current site survey and photography for context that has to be recognisable. Record the camera position and photograph date when an aerial render is built onto a real drone image. The production brief can then separate modelled work from the photographed surroundings.
Start with Central Otago District Council's Cromwell Masterplan. It describes the town's long-term spatial direction. Use it as background for understanding the area, while the project's own approved drawings and the current district plan govern the actual brief.
Prepare a real site photograph for accurate model placement.
Check what a river or hillside camera actually shows.
Choose the order of aerial, street, interior and film assets.
Review source revisions before campaign export.
Yes. RAM Projects commissioned Rocks on Holloway and then Molyneux. Each project has a published case study with its image set and deliverables.
Yes. That is how the Molyneux aerial views were made. We need the original photograph, camera information, survey and current building drawings to check scale and position.
No. Both published RAM Projects campaigns included films, but the right deliverables depend on the questions the campaign must answer and where the assets will appear.
Last updated 16 November 2026
Send the drawings, site photos and proposed campaign placements. We will identify which views need real context and which can be produced from the model.